This page explains which steps Devka Doğalgaz handles for you during a natural gas subscription in Antalya: across the five steps of application, project approval, indoor pipework, technical report and commissioning inspection, you will see who does what.

The natural gas distribution licence for Antalya belongs to Enerya Antalya Gaz Dağıtım A.Ş. Subscription and gas commissioning belong to the distribution company, while designing and installing the indoor pipework is the job of a certified installation company. Devka Doğalgaz takes on that second part in full and manages the correspondence with the distribution company on your behalf.

Guide to subscription documents and the application

How to apply, which documents you need, the differences for tenants and businesses, and what to watch for in each district are covered in a separate guide.

Read the Antalya natural gas subscription guide

Step by step

  1. Subscription application and documents

    You apply to the distribution company for a subscription. Documents such as the title deed or tenancy agreement, ID and the compulsory earthquake insurance policy are prepared, and the connection agreement is signed.

    Who does it: You and Enerya Antalya; we help you prepare the documents

  2. Project drawing and approval (TS 7363)

    The indoor pipework project is drawn to the TS 7363 standard and the technical rules of the distribution company. Appliance capacities, pipe diameters, flue and ventilation solutions are shown and the project is submitted for approval.

    Who does it: Devka Doğalgaz

  3. Pipework installation and tightness test

    The pipe route is installed to the approved project and appliance connections are made. The completed system is pressure tested for tightness and the result is recorded.

    Who does it: Devka Doğalgaz

  4. Technical report and handover

    A technical report is prepared listing the engineer and installer, the materials used, the pressure class and the test results. The report is handed to the customer and the distribution company before gas is opened.

    Who does it: Devka Doğalgaz

  5. Gas commissioning inspection

    An inspection appointment is booked with the distribution company. Their technical team checks the installation on site and, if everything is in order, the meter is fitted and gas is opened. Our team attends on the day.

    Who does it: Devka books the visit, Enerya Antalya carries out the inspection

Documents you need to prepare

  • Copy of the title deed or tenancy agreement
  • Copy of the ID of the person subscribing
  • Compulsory earthquake insurance (DASK) policy
  • Occupancy permit for the building
  • Tax certificate (for commercial subscriptions)
  • Building management approval for the riser, if required

What each document is for and how it varies by subscriber type: Antalya natural gas subscription documents guide

Official pages of the distribution company

The distribution licence for Antalya belongs to Enerya Antalya Gaz Dağıtım A.Ş. For current fees, the document list and the certified installer list, check the distributor’s own pages.

How long does it take?

From approval of the application to the visit of the distribution company technical team usually takes 3–7 working days. Indoor pipework in a single flat takes on average 1–2 days. Total duration depends on the building, missing documents and the appointment load of the distribution company.

Choosing an installer

The company carrying out the indoor pipework must hold a valid Indoor Installation and Service Lines Certificate issued by the distribution company. Work done without that certificate is rejected at the commissioning inspection and has to be redone.

Start the process with us

From gathering documents to the commissioning appointment, we are with you at every step. Call today for a free survey.